Project Overview

Byblos Constructions was engaged to deliver the installation of a marquee structure at the West Angelas Aerodrome to provide a safe, weather-protected, and air-conditioned waiting and crib area for both passengers and operational staff.

The project addressed limited existing facilities and required full integration of civil, electrical, and mechanical works within a live aerodrome environment.

Scope of Works

  • Mobilisation, site establishment, permits, and aerodrome-safe work controls
  • Careful dismantling, relocation, and storage of existing storage shed and infrastructure
  • Demolition and removal of concrete pad, fencing, services, and redundant assets
  • Minor alterations to fire truck shed including door relocation and concrete works
  • Bulk earthworks, footing construction, retaining, and civil preparation for marquee
  • Supply and installation of marquee structure including flooring, doors, stairs, and internal partition
  • Internal fit-out including seating, kitchenette, benching, and amenities
  • Plumbing installation including potable water, drainage, and wastewater pumping
  • Electrical, comms, and services installation including power, GPOs, network, and PA integration
  • Generator supply and installation including fuel system and concrete bases
  • Installation of HVAC systems including split units, ducting, and ventilation
  • Installation of fencing, walkways, bollards, and access interfaces
  • Stormwater, drainage, and reinstatement works
  • Testing, commissioning, and project handover

Key Challenges

  • Delivering works within a live aerodrome environment with ongoing flight operations
  • Maintaining safe access and segregation of passengers, vehicles, and construction activities
  • Coordinating multiple work fronts (civil, electrical, structural) within a constrained footprint
  • Managing logistics, deliveries, and plant movement in high-traffic operational areas
  • Ensuring compliance with BCA requirements, IFMS standards, and site safety protocols

Outcomes

The marquee installation was successfully delivered, providing:

  • A functional, air-conditioned waiting and crib facility for staff and passengers
  • Improved amenity and comfort within the aerodrome environment
  • Safe, compliant infrastructure integrated with existing operations
  • Minimal disruption to aerodrome activities during construction

Project Gallery

Filter by area:

Project Area Filter

Filter by capability:

Project Capability Filter
All Projects
Ashburton,
Paraburdoo, 
WA 
6754
Big Bell Accommodation Village,
Goldfields, 
WA 
6640
Yandicoogina,
Newman, 
WA 
6753
Visitor Information Bay,
Tom Price, 
WA 
6751
7 Mile Dampier Road,
Gap Ridge, 
WA 
6714
Yandicoogina,
Newman, 
WA 
6753
East Road,
Tom Price, 
WA 
6751
Fitzroy Crossing, 
WA 
6765
document.addEventListener('DOMContentLoaded', function () { const heading = document.querySelector('#MapHeading .elementor-heading-title'); const radios = document.querySelectorAll('.jet-radio-list__input[name="project-area"]');radios.forEach(function (radio) { radio.addEventListener('change', function () { const label = this.dataset.label; if (label === 'All') { heading.textContent = 'All Projects'; } else if (label.endsWith('Projects')) { heading.textContent = label; } else { heading.textContent = label + ' Projects'; } }); }); });

Delivering projects across the Pilbara and beyond

Discover how Byblos can support your next project.