Project case study

BioMax Leach Drains (The Loop)

Client

RTIO

Location

Yandi Mine, 
Newman, 
WA 
6753

Status

Completed

Project Overview

Byblos Constructions was engaged to deliver the supply and installation of an 18kL BioMax Aerated Treatment Unit (ATU) system and associated discharge leach pad at Rio Tinto’s Yandi Mine.

The project formed part of infrastructure upgrades within the “Loop” facilities, requiring integrated civil, plumbing, and electrical works delivered within an operational mining environment and in accordance with RTIO and Australian Standards.

Scope of Works

  • Site establishment, permits, and HSE compliance
  • Clearing and preparation of leach pad and BioMax footprint
  • Supply & installation of 18kL BioMax ATU system
  • Construction of new discharge leach pad
  • Installation of fencing, gates, and signage
  • Installation of potable water services and emergency shower facilities
  • Modifications to existing pipework and services
  • Installation of filtration, sample point, and flow meter
  • Decommissioning of existing septic tanks and leach drains
  • Removal and off-site disposal of redundant infrastructure
  • Electrical installation including cabling, control systems, and DB connections
  • Testing, commissioning, and full project documentation (ITRs)

Key Challenges

  • Delivering works within a live mining operation while maintaining safety and compliance
  • Coordinating civil, hydraulic, and electrical disciplines concurrently
  • Managing installation in a remote Pilbara environment with logistical constraints
  • Ensuring compliance with RTIO specifications (SS-N104, SSB-105) and Australian Standards
  • Working within design and permitting requirements, including Department of Health approvals

Outcomes

Byblos successfully delivered the BioMax ATU system and leach pad installation in line with client requirements, achieving:

  • Safe and compliant delivery of all civil, plumbing, and electrical works
  • Seamless integration with existing infrastructure
  • Efficient wastewater treatment solution meeting operational and environmental standards
  • Full commissioning and documentation handover in accordance with RTIO requirements

Filter by area:

Project Area Filter

Filter by capability:

Project Capability Filter
All Projects
Ashburton,
Paraburdoo, 
WA 
6754
Big Bell Accommodation Village,
Goldfields, 
WA 
6640
Yandicoogina,
Newman, 
WA 
6753
Visitor Information Bay,
Tom Price, 
WA 
6751
7 Mile Dampier Road,
Gap Ridge, 
WA 
6714
Yandicoogina,
Newman, 
WA 
6753
East Road,
Tom Price, 
WA 
6751
Fitzroy Crossing, 
WA 
6765
document.addEventListener('DOMContentLoaded', function () { const heading = document.querySelector('#MapHeading .elementor-heading-title'); const radios = document.querySelectorAll('.jet-radio-list__input[name="project-area"]');radios.forEach(function (radio) { radio.addEventListener('change', function () { const label = this.dataset.label; if (label === 'All') { heading.textContent = 'All Projects'; } else if (label.endsWith('Projects')) { heading.textContent = label; } else { heading.textContent = label + ' Projects'; } }); }); });

Delivering projects across the Pilbara and beyond

Discover how Byblos can support your next project.